Gantt Chart with User Defined Formatting
Main Interface Showing Different Constraint Types in Network Diagram
Multi-line Resource Allocation Display
Split Display with Gantt Chart, Histogram Plot, and Single Element PERT
The split display allows the user to view data from two points of view at the same time. In this case, it has been configured with a Gantt Chart on the top, and a Histogram Plot on the bottom. Both of the displays have conditional coloration applied, allowing different jobs/activities to show with different fill color, permitting easy visual analysis. The Single Element PERT allows the user to view the predecessors and successors of the currently selected activity in a small PERT chart. This also permits navigation for easy exploration of the schedule.
Burndown by Day Plot
Accumulation by Day Plot
Main Interface with Single-Element View and Zoom Panel
Baseline and Snapshot Gantt Chart
Histogram with Custom Coloring
Spatial Plot, Snapshot with Criteria-Based Color Coding
Generated Explanation Showing Impact of Multiple Predecessors
This shows several Aurora displays, but the focus is on the generated explanations. The Aurora explanations are generated automatically during scheduling, and allow insight into why things scheduled the way they did. In this case, the explanation shows the date impact of multiple predecessors and successors, each reducing the possible scheduling timeframe of the activity. The explanation is built up sequentially, with earlier inputs falling higher on the list. The end of the list shows the final scheduling decision. This screenshot also shows a resource plot in the background and a Single Element PERT allowing the user to see the predecessors and successors that are reflected in the explanation. The displays have conditional coloration applied, allowing different jobs/activities to show with different fill color, permitting easy visual analysis.
Automatically Generate Explanation: Influenced by Predecessors, Successors, Delay Waiting for Mechanic Resource
PERT Single Element Display
Resource-Activity Schedule Display, with Overlapping Shifts
Pert Display
Schedulable Properties
Multi-Project View
Spatial Plot
PERT Tabular Editor
Main Display Showing Project Hierarchy Network Diagram
PERT Chart
Resource-Activity Schedule Display, Including the Hazardous Pad Area
Manpower Histogram, Showing Activities Constituting Manpower Need for One Time Instance
Gantt Chart with Color Coding by Properties
Network Diagram, Color Coded by Various Criteria
Network diagram, Color Coded by Various Criteria, Zoomed Out
Conflict Report
Resource Hierarchy
Calendar Plot
Intern Block Schedule Call Showing.
Calendar Plot
Junior Block Scheduling full interface rotation resident x ref.
Calendar Plot
Junior Block Scheduling rotation resident x ref.
Viable Personnel Visualization Small Acceptable Set
(small range of possible personnel; two are working a different/late set of work)
Viable Personnel Visualization Medium Acceptable Set
(large range of possible personnel, but large/late workgroup; gray bar indicates one auditor is on vacation)
Selected activity was dragged, schedule was updated
(note pin icon)
Calendar Plot
Easy configuration via common filter options – see upper right (currently filtered for D3)
Calendar Plot
Added filter for section (shows schedule for one subset of students in the class)
Calendar Plot
Same timeframe; filtered by room
Calendar Plot
Same timeframe; filtered by student (overlapping allocations reflect “preemptions” where student is pulled from one experience to engage in another experience)
Issue Management – Schedule Report
Calendar Plot
Intern Block Schedule.
Calendar Plot
Junior Block Schedule.
Calendar Plot
Junior Block Scheduling rotation resident x ref.
Calendar Plot
Per Resident Clinic Sched.
Calendar Plot
Senior Block Scheduling rotation resident x ref.
Would you like a FREE Demo
Contact Us
Please enter your contact details, company name and a short message below and we will answer your query as soon as possible.
Contact Us